Design and coordination
Confirm coverage objectives, device locations, cabinet space, power, pathways and interfaces with architecture, electrical and mechanical work.
First fix and inspection
Install pathways and cables, label both ends and inspect before ceilings or walls are closed.
Second fix to handover
Terminate, configure, test, train users and deliver drawings, credentials, warranties and test records.
Project checklist
- Approve device locations before first fix
- Record changes while work is visible
- Do not accept handover without tests and as-built drawings
Practical takeaways
- Define the operating requirement before choosing products
- Document interfaces, failure behaviour and ownership
- Test the completed system and keep records for support